2Pack SG90 Micro Servo Motor 180 Degree 9G Gear Motor for RC Car Robot Helicopter Airplane Boat DIY Project Control
2Pack SG90 Micro Servo Motor 180 Degree 9G Gear Motor for RC Car Robot Helicopter Airplane Boat DIY Project Control
About this item
- SG90 9G Digital Servo Motor offers precise 180-degree rotation for RC models and DIY projects
- Compact and lightweight at only 9 grams; ideal for micro robots, robotic arms, RC cars, boats, and helicopters
- Provides reliable torque of 1.4kg/cm at 4.8V and a fast speed of 0.09 sec/60° for responsive control
- Universal compatibility with Arduino, Raspberry Pi, and standard receiver interfaces like JR and Futaba
- Includes essential components for easy setup, perfect for hobbyists and electronics enthusiasts
Couldn't load pickup availability
Low stock: 10 left
View full details

Reviews
-
⭐⭐⭐⭐⭐
Hannah Miller — Seattle, Washington
I ordered several science activity supplies for projects at home. The product descriptions made it easier to compare the available options, and everything fit neatly into our learning space. Stemora made finding tools for hands-on activities feel simple and organized. -
⭐⭐⭐⭐⭐
Daniel Foster — Austin, Texas
I found a useful selection of electronics and robotics accessories for a beginner project. It was convenient to browse related components in clearly organized categories. I would consider shopping here again when planning another maker activity. -
⭐⭐⭐⭐⭐
Lauren Bennett — Denver, Colorado
The measurement and observation tools I selected worked well for the classroom activities I had planned. I especially appreciated being able to review the product details before ordering and choose items that matched the lesson requirements. -
⭐⭐⭐⭐⭐
Jason Parker — Portland, Oregon
I purchased a few storage items and small tools for organizing my maker workspace. The products helped keep components, wires, and project materials easier to sort and access. The overall shopping experience was straightforward and convenient.
New Arrivals
-
6 pc Slotted & Phillips Precision Screwdriver Set
Regular price $70.35 USDRegular priceSale price $70.35 USD -
PATIKIL Convex Lens, 150-150mm Focal Length 50mm (1.97") Diameter Round Glass Magnifying Telescope Lens Trial Set Ground Edge for Lab Physics Class Optics, 4 Pcs - size: 150/-150mm FL, 50mm Dia.
Regular price $23.39 USDRegular priceSale price $23.39 USD -
ECR4Kids Letter Size Plastic Tray Organizer with Lids, Small, Storage Bins, Black, 10-Piece - color: Black
Regular price $124.48 USDRegular priceSale price $124.48 USD -
Electronic Component Starter Kit: Switches, LEDs, Resistors, Potentiometers for Arduino DIY by Envistia Mall
Regular price $12.43 USDRegular priceSale price $12.43 USD -
PATIKIL Convex Lens, 150mm Focal Length 50mm (1.97") Diameter Round Glass Magnifying Telescope Lens Trial Set Ground Edge for Lab Physics Class Optics, 4 Pcs - size: 150mm FL, 50mm Dia.
Regular price $21.56 USDRegular priceSale price $21.56 USD -
8PCS 3D Printer Silicone Socks Cover Sleeve for Bambu Lab H2D/H2S
Regular price $13.26 USDRegular priceSale price $13.26 USD -
Crayola Art Kit with Swirl & Pastel Art Supplies, Includes Crayons, Markers & Colored Pencils, Arts & Crafts Activity Set, Gift for Kids, Ages 5, 6, 7, 8 - style: Swirl + Pastel
Regular price $53.10 USDRegular priceSale price $53.10 USD -
PATIKIL Convex Lens, 100-100mm Focal Length 50mm (1.97") Diameter Round Glass Magnifying Telescope Lens Trial Set Ground Edge for Lab Physics Class Optics, 4 Pcs - size: 100/-100mm FL, 50mm Dia.
Regular price $16.58 USDRegular priceSale price $16.58 USD -
Crayola Silly Scents Mini Inspiration Art Case, Scented Crayons & Markers Set, Art Kit for Kids, Coloring Supplies, Travel Gifts for Kids, Ages 4+ - style: Silly Scents
Regular price $24.62 USDRegular priceSale price $24.62 USD -
ECR4Kids Letter Size Tray Organizer with Lid, Small, 10-Piece, Assorted - color: Assorted
Regular price $107.88 USDRegular priceSale price $107.88 USD -
PATIKIL Convex Lens, 100-100mm Focal Length 40mm (1.57") Diameter Round Glass Magnifying Telescope Lens Trial Set Ground Edge for Lab Physics Class Optics, 4 Pcs - size: 100/-100mm FL, 40mm Dia.
Regular price $20.73 USDRegular priceSale price $20.73 USD -
SciTech2U Lab Notebook: Professional scientific lab notebook for students.
Regular price $13.28 USDRegular priceSale price $13.28 USD -
PATIKIL Convex Lens, 100mm Focal Length 50mm (1.97") Diameter Round Glass Magnifying Telescope Lens Trial Set Ground Edge for Lab Physics Class Optics, 4 Pcs - size: 100mm FL, 50mm Dia.
Regular price $22.56 USDRegular priceSale price $22.56 USD -
Crayola Pokémon Imagination Art Set (115pcs), Kids Art Kit, Coloring Supplies, Pokemon Toys, Pokemon Gift for Boys & Girls, Ages 5+ - style: Pokémon
Regular price $46.85 USDRegular priceSale price $46.85 USD -
PATIKIL Convex Lens, 100mm Focal Length 40mm (1.57") Diameter Round Glass Magnifying Telescope Lens Trial Set Ground Edge for Lab Physics Class Optics, 4 Pcs - size: 100mm FL, 40mm Dia.
Regular price $20.73 USDRegular priceSale price $20.73 USD -
BLU MONACO Set of 6 Foldable White Magazine File Holders | Vertical Desk File Organizer Boxes With Leather Label Holders | Stylish Cardboard Magazine Storage for Shelves, Workspace and Home Office - color: Pure White
Regular price $68.04 USDRegular priceSale price $68.04 USD -
ECR4Kids Letter Size Plastic Tray Organizer with Lids, Small, Storage Bins, Contemporary, 10-Piece - color: Contemporary
Regular price $107.88 USDRegular priceSale price $107.88 USD -
PATIKIL Convex Lens, 50-75 100-100mm Focal Length 30/50mm (1.18/1.97") Diameter Round Glass Magnifying Telescope Lens Trial Set Ground Edge for Lab Physics Class Optics, 4 Pcs - size: 50/-75/100/-100mm FL, 30/50mm Dia.
Regular price $21.56 USDRegular priceSale price $21.56 USD
FAQ
What types of products does Stemora offer?
Stemora offers supplies for science experiments, microscopy, biology learning, measurement, laboratory organization, electronics, robotics, coding education, 3D printing, maker projects, and classroom activities. Available products and specifications may change over time.
Are Stemora products suitable for children?
Recommended ages vary by product. Please review the product description, manufacturer guidance, included warnings, and required skill level before purchasing. Products containing small parts, tools, electrical components, glass, or chemicals may not be suitable for young children.
Is adult supervision required?
Adult supervision is recommended for children and students, especially when using electrical components, sharp tools, heated equipment, glassware, small parts, or experiment materials. Customers are responsible for following all product instructions and safety precautions.
Can these products be used at home and in classrooms?
Many products may be suitable for classrooms, home learning, science projects, maker spaces, and hobby activities. Suitability depends on the specific product, learning environment, user experience, and intended activity.
How can I check what is included with a product?
Please review the product title, description, specifications, images, package quantity, and included-components section before ordering. Items shown for demonstration or scale in product images may not always be included.
How do I know whether an electronic or robotics part is compatible?
Check the listed dimensions, voltage, connector type, board compatibility, operating requirements, and supported platforms. Compatibility is not guaranteed unless it is specifically stated on the product page. Contact us before ordering if you need clarification.
When will I receive tracking information?
Tracking information is generally provided within 3–5 business days after an order is confirmed. In some cases, processing may take approximately 7–8 business days. Delivery may require an additional 4–5 business days after tracking becomes available, depending on the carrier and destination.
Why did my order arrive in separate packages?
Products in the same order may be shipped from different fulfillment locations. As a result, items may arrive separately and have different tracking numbers. You will not be charged additional shipping fees solely because an order is divided into multiple packages.
Can I change or cancel my order?
Contact us as soon as possible at vaioamaonaoak@gmail.com. We will try to assist, but changes or cancellations cannot be guaranteed once an order has entered processing or has been shipped.
What should I do if an item arrives damaged, defective, or incorrect?
Contact us promptly at vaioamaonaoak@gmail.com with your order number, a description of the issue, and clear photographs of the item, packaging, and shipping label. Please retain the product and original packaging while we review your request. Eligibility and available resolutions are subject to our Return & Refund Policy.
Blog posts
View all-
Arduino Wiring Errors: 7 Mistakes Beginners Mak...
Troubleshooting Arduino wiring errors becomes easier when you know where to look first. Learn how to identify common breadboard, power, polarity, grounding, and pin-assignment mistakes in beginner electronics projects
Arduino Wiring Errors: 7 Mistakes Beginners Mak...
Troubleshooting Arduino wiring errors becomes easier when you know where to look first. Learn how to identify common breadboard, power, polarity, grounding, and pin-assignment mistakes in beginner electronics projects
-
The Beginner’s Wiring Mistakes That Can Quietly...
Learn how to troubleshoot common Arduino wiring errors in beginner electronics projects. Discover practical breadboard, LED, sensor, power, and grounding checks that make STEM maker projects easier to debug.
The Beginner’s Wiring Mistakes That Can Quietly...
Learn how to troubleshoot common Arduino wiring errors in beginner electronics projects. Discover practical breadboard, LED, sensor, power, and grounding checks that make STEM maker projects easier to debug.
-
Arduino Wiring Errors: A Step-by-Step Guide to ...
Learn how to troubleshoot common Arduino wiring errors with a practical step-by-step process covering power, ground, breadboards, LEDs, sensors, signals, and testing. Build stronger electronics skills while turning circuit failures...
Arduino Wiring Errors: A Step-by-Step Guide to ...
Learn how to troubleshoot common Arduino wiring errors with a practical step-by-step process covering power, ground, breadboards, LEDs, sensors, signals, and testing. Build stronger electronics skills while turning circuit failures...















