{"product_id":"100pcs-3mm-yellow-flicker-flickering-led-diodes-candle-flicking-lights-clear-round-lens-29mm-long-lead-dc-2v-light-emitting-diode-lamp-bulb-100pcs-resistors-470ohm-for-dc-6-12v-included-color-06-yellow-100pcs-style-e-3mm-flickering-light","title":"100pcs 3mm Yellow Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included - color: [06] Yellow \/ 100pcs, style: [E] 3mm Flickering Light","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n\u003cli\u003eProduct Features: Yellow Lights Flickering \/ 3mm Round Clear Lens \/ 29mm Long Lead\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: Candle Lights Keep Flickering \/ DC 2.0V-2.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 585nm-595nm \/ 30° Viewing Angle \/ Single LED Diodes Wight: 0.16g\u003c\/li\u003e\n\u003cli\u003eAccessories: 100pcs 470ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ ±1% Tolerance\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e EDGELEC\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLight Type:\u003c\/strong\u003e LED\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecial Feature:\u003c\/strong\u003e Flicker LED (Candle Flickering Lights)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBulb Shape Size:\u003c\/strong\u003e B9\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncandescent Equivalent Wattage:\u003c\/strong\u003e 8 watts\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"EDGELEC","offers":[{"title":"Default Title","offer_id":67597442711772,"sku":"B0785DQ8FD-color-06-yellow-100pcs-style-e-3mm-flickering-light","price":16.58,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0837\/0913\/3020\/files\/41323NO6ZJL.jpg?v=1790650588","url":"https:\/\/stemora.us\/products\/100pcs-3mm-yellow-flicker-flickering-led-diodes-candle-flicking-lights-clear-round-lens-29mm-long-lead-dc-2v-light-emitting-diode-lamp-bulb-100pcs-resistors-470ohm-for-dc-6-12v-included-color-06-yellow-100pcs-style-e-3mm-flickering-light","provider":"Stemora","version":"1.0","type":"link"}