{"product_id":"100pcs-3mm-green-lights-led-diodes-green-lens-diffused-round-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bulb-lamps-light-emitting-diode-color-05-green-green-100pcs-style-3mm-constant-light-1","title":"100pcs 3mm Green Lights LED Diodes (Green Lens) Diffused Round Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode - color: [05] Green-green \/ 100pcs, style: 3mm Constant Light","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n\u003cli\u003eProduct Features: Green \/ 3mm Diffused Round Lens \/ Green Lens\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V-3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 520nm-525nm \/ 120° Viewing Angle \/ Single LED Diodes Wight: 0.16g\u003c\/li\u003e\n\u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ ±1% Tolerance\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e EDGELEC\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLight Type:\u003c\/strong\u003e LED\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecial Feature:\u003c\/strong\u003e Instant On\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncandescent Equivalent Wattage:\u003c\/strong\u003e 0.05 watts\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecific Uses For Product:\u003c\/strong\u003e General purpose\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"EDGELEC","offers":[{"title":"Default Title","offer_id":67611143176412,"sku":"B077XB9CWH-color-05-green-green-100pcs-style-3mm-constant-light","price":11.6,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0837\/0913\/3020\/files\/41pIuRH6exL_e2efe268-7541-49d4-8052-87d551bd9d12.jpg?v=1790824350","url":"https:\/\/stemora.us\/products\/100pcs-3mm-green-lights-led-diodes-green-lens-diffused-round-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bulb-lamps-light-emitting-diode-color-05-green-green-100pcs-style-3mm-constant-light-1","provider":"Stemora","version":"1.0","type":"link"}