{"product_id":"100pcs-3mm-green-lights-led-diodes-clear-round-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bright-bulb-lamps-light-emitting-diode-color-07-green-100pcs-style-a-3mm-constant-light-2","title":"100pcs 3mm Green Lights LED Diodes Clear Round Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode - color: [07] Green \/ 100pcs, style: [A] 3mm Constant Light","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n\u003cli\u003eProduct Features: Green - 3mm Round Clear Lens\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V-3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n\u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 520nm-525nm \/ 30° Viewing Angle \/ Single LED Diodes Wight: 0.16g\u003c\/li\u003e\n\u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ ±1% Tolerance\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e EDGELEC\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLight Type:\u003c\/strong\u003e LED\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecial Feature:\u003c\/strong\u003e Instant On\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecific Uses For Product:\u003c\/strong\u003e General purpose\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLight Color:\u003c\/strong\u003e green\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"EDGELEC","offers":[{"title":"Default Title","offer_id":67597445988572,"sku":"B077X91PSD-color-07-green-100pcs-style-a-3mm-constant-light","price":11.6,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0837\/0913\/3020\/files\/41E4ZcwtfGL_7b2bc16f-1ff5-4e49-b236-c926e9e2e015.jpg?v=1790650840","url":"https:\/\/stemora.us\/products\/100pcs-3mm-green-lights-led-diodes-clear-round-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bright-bulb-lamps-light-emitting-diode-color-07-green-100pcs-style-a-3mm-constant-light-2","provider":"Stemora","version":"1.0","type":"link"}